Airparks construction Summer of 2012

More soil preperation.

Digging the ditch and installing culvert drainage for the access road .

Creating access road.

Leasing the proper equipment.

Getting professional assistance grading the land . Making necessary adjustments to equiptment.

Getting the soil tilled to the correct grade.

This is the very beginning of the land on the east west runway.

Soil compaction process.

1st phase of construction and lay out.

Start of pilots tables in the pit area.

Access from pit area to runway.

Shade structure location preparation .

Shade structure preparation .

Foundation for storage shed.

Storage shed construction .

More storage shed construction.